遇见数据集

Table 4 - 7 in 21 - MSK-JOR-ENV - Preliminary Risks Assessment and ESIA for the Aqaba-Amman Water Desalination and Conveyance (AAWDC) Project (Jordan) - Renewable Energy Component

收藏
Zenodo2025-11-27 更新2026-05-26 收录
官方服务:

资源简介:

Table 4-7: Description of Impact Significance Results NNegligible: • No measurable impact. Issues identified as negligible can be scoped out.Low:L• No considerable adverse alteration of the existing environmentSignificanceM• Low priority mitigation or mitigated through best practices Moderate: • Results in considerable adverse alteration of the existing environment• Impact is a priority for mitigation to minimize or prevent the significance of the impactHigh:H• Results in considerable adverse alteration of the existing environment• Project cannot be safely implemented without mitigation measures; compensation or

表4-7:影响显著性(Impact Significance)结果说明 无足轻重(Negligible):• 无任何可量化的影响,可将归类为无足轻重的影响项排除在评估范围之外。 低影响(Low,标注L):• 未对现有环境造成显著不利改变;• 缓解措施优先级较低,或可通过最佳实践完成影响缓解。 中等影响(Moderate,标注M):• 对现有环境造成显著不利改变;• 该影响为缓解优先级事项,需尽可能降低或遏制影响的显著性。 高影响(High,标注H):• 对现有环境造成显著不利改变;• 若无缓解措施则无法安全实施该项目;需采取补偿或

创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务