five

The two planning methods (3 and 5) described most frequently by the participants (used as the basis for the groups formed for the regression analysis) and average values of the estimated time requirements.

收藏
Figshare2025-02-04 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/The_two_planning_methods_3_and_5_described_most_frequently_by_the_participants_used_as_the_basis_for_the_groups_formed_for_the_regression_analysis_and_average_values_of_the_estimated_time_requirements_/28345921
下载链接
链接失效反馈
官方服务:
资源简介:
PSH15 = productive system hours per hectare including all interruptions

PSH15代表每公顷生产系统总工时,涵盖所有中断时段
创建时间:
2025-02-04
二维码
社区交流群
二维码
科研交流群
商业服务