The two planning methods (3 and 5) described most frequently by the participants (used as the basis for the groups formed for the regression analysis) and average values of the estimated time requirements.
收藏Figshare2025-02-04 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/The_two_planning_methods_3_and_5_described_most_frequently_by_the_participants_used_as_the_basis_for_the_groups_formed_for_the_regression_analysis_and_average_values_of_the_estimated_time_requirements_/28345921
下载链接
链接失效反馈官方服务:
资源简介:
PSH15 = productive system hours per hectare including all interruptions
PSH15代表每公顷生产系统总工时,涵盖所有中断时段
创建时间:
2025-02-04



