five

Crooked River

收藏
US Fish and Wildlife Service Open Data2026-03-28 收录
下载链接:
https://gis-fws.opendata.arcgis.com/datasets/fws::crooked-river
下载链接
链接失效反馈
官方服务:
资源简介:
<div style='text-align:center;'><strong>Measure CR-1: Crooked River Flow Downstream of Bowman Dam</strong></div><p><br /><b>Responsible Permittee: </b><a href='https://www.ochocoid.org/' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OID</u></font><br /></a><b>Species Affected: </b><i>bull trout, steelhead, sockeye salmon</i><br /><br />In coordination with Reclamation, Ochoco Irrigation District (OID) will bypass live flow and/or release OID contracted storage to maintain a daily average flow of 50 cfs<sup>1</sup> at <a href='https://apps.wrd.state.or.us/apps/sw/hydro_near_real_time/display_hydro_graph.aspx?station_nbr=14080500' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OWRD Gage 14080500</u></font></a>below Bowman Dam (<a href='https://www.usbr.gov/pn/hydromet/rtgraph.html?list=prvo%20q&amp;daily=prvo%20qd' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>Hydromet Station PRVO</u></font></a>) outside the active irrigation season<sup>2</sup> whenever all of the following conditions exist:</p><ol> <li>All uncontracted storage available in Prineville Reservoir on the annual day of allocation, up to a maximum of 13,000 acre feet, is held until the end of the active irrigation season<sup>2</sup> and thereafter released at a daily average rate of 50<sup>1</sup> cfs as measured at PRVO.</li> <li>All City of Prineville mitigation storage available in Prineville Reservoir on the annual day of allocation and not required for another mitigation use<sup>3</sup>, up to a maximum of 5,100 acre feet, is held until December 1 and thereafter released in lieu of uncontracted storage to maintain the daily average flow of 50 cfs as measured at PRVO.</li> <li>The combined total of available uncontracted storage (up to 13,000 acre-feet) and available City of Prineville mitigation storage described herein is insufficient to maintain the daily average flow of 50 cfs as measured at PRVO until the beginning of the next irrigation season.</li> </ol> <p> Water that is temporarily leased instream from OID patrons may be used to support the flow of 50 cfs (±5 cfs), except during the period from December 1 through January 31.</p> <p>During the active irrigation season, the DBHCP will not obligate OID or NUID to allow bypass of live flow or release of contracted storage by Reclamation on OID’s or NUID’s behalf to maintain specific instream flows at PRVO Gage or CAPO Gage. However, OID will not divert stored water at the Crooked River Diversion until the water has been released from Prineville Reservoir and adequate time has elapsed for the water to reach the diversion. In addition, as the operator of Bowman Dam, OID will respond to calls for Prineville Reservoir stored water from other contract holders and begin releasing the requested water within 24 hours.</p> <table style='border-collapse:collapse; border:none; font-size:8.0pt;'> <tbody> <tr> <td style='border-top:solid 0.5pt; padding:5px;'>1 Actual flows in the Crooked River may be ±10% of flows specified in Measure CR 1 due to inherent inaccuracies in flow measuring devices.</td> </tr> <tr> <td style='padding:5px;'>2 For purposes of this conservation measure, the <em>active irrigation season</em> on the Crooked River is the period of time during which water is being diverted at the Crooked River Diversion for delivery to OID patrons. This period typically occurs from mid April to mid October, with actual dates varying slightly from year to year.</td> </tr> <tr> <td style='padding:5px;'>3 The use of City of Prineville mitigation storage in this way is contingent on approval by Oregon Water Resources Department and subject to any preemptory use of the water. The actual amount of City of Prineville mitigation storage used as described in this measure may be less than the total present in Prineville reservoir on the day of allocation.</td> </tr> </tbody></table> <div style='text-align:center;'><strong><br />Measure CR 6: Crooked River Flow Downstream of the Crooked River Pumps</strong></div><br /><p><b>Responsible Permittee: </b><a href='https://www.northunitid.com/' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>NUID</u></font></a><br /><b>Species Affected: </b><i>bull trout, steelhead, sockeye salmon</i> <br /><br />For the term of the DBHCP, except for water made available to North Unit Irrigation District (NUID) from Prineville Reservoir, whether under a Temporary Water Service Contract with Reclamation or acquisition from another contract holder, NUID will only divert water at the Crooked River Pumps (RM 27.6) when the minimum daily average flow indicated in Table CR 6 can be maintained, as measured in real time at <a href='https://apps.wrd.state.or.us/apps/sw/hydro_near_real_time/display_hydro_graph.aspx?station_nbr=14087300' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OWRD Gage 14087300</u></font></a> (RM 27.0) or an alternate gage location established by Oregon Water Resources Department (OWRD) that adequately describes stream flow in the reach downstream of the Crooked River Pumps.</p> <p style='font-size:9pt;'><b>Table CR 6. Minimum flows to be maintained downstream of the Crooked River Pumps when NUID is diverting water at the pumps<sup>1</sup>.</b></p> <table style='border-collapse:collapse; border:none; font-size:8.0pt;'> <tbody><tr> <th style='border-top:solid 0.5pt; text-align:center;'></th> <th colspan='2' style='border-top:solid 0.5pt; border-bottom:solid 1.0pt; padding:7px; text-align:center;'>Minimum Daily Average Flow (cfs)</th> </tr> <tr style='border-bottom:solid 1.5pt;'> <th>Month</th> <th style='padding:5px; text-align:center;'>Dry Year</th> <th style='padding:5px; text-align:center;'>Non-Dry Year</th> </tr> <tr> <td style='padding:5px;'>April</td> <td style='text-align:center; padding:5px;'>120</td> <td style='text-align:center;'>181</td> </tr> <tr style='background:#F2F2F2;'> <td style='padding:5px;'>May</td> <td style='text-align:center; padding:5px;'>50</td> <td style='text-align:center;'>95</td> </tr> <tr> <td style='padding:5px;'>June</td> <td style='text-align:center; padding:5px;'>54</td> <td style='text-align:center;'>86</td> </tr> <tr style='background:#F2F2F2;'> <td style='padding:5px;'>July</td> <td style='text-align:center; padding:5px;'>51</td> <td style='text-align:center;'>61</td> </tr> <tr> <td style='padding:5px;'>August</td> <td style='text-align:center; padding:5px;'>56</td> <td style='text-align:center;'>68</td> </tr> <tr style='background:#F2F2F2;'> <td style='padding:5px;'>September</td> <td style='text-align:center; padding:5px;'>57</td> <td style='text-align:center;'>114</td> </tr> <tr style='border-bottom:solid 0.5pt;'> <td style='padding:5px;'>October</td> <td style='text-align:center; padding:5px;'>121</td> <td style='text-align:center;'>151</td> </tr> <tr> <td colspan='3' style='padding:5px;'><sup>1</sup> Daily average flows at <a href='https://apps.wrd.state.or.us/apps/sw/hydro_near_real_time/display_hydro_graph.aspx?station_nbr=14087300' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OWRD Gage 14087300</u></font> </a> shall be no less than the specified minimums. NUID will also attempt to keep hourly average flows at or above the specified minimums by manually adjusting diversion rates in response to changes in flow upstream of the pumps, but in recognition of the inherent difficulty in making manual adjustments around the clock the hourly average flows may be up to 20% less than the specified minimums until December 31, 2024. NUID will install equipment at the pumps to automate diversion rate adjustment, and starting no later than January 1, 2025 the daily average and hourly average flows shall both be no less than the specified minimums.</td> </tr> </tbody></table> <p>For purposes of this measure, Dry Years and Non Dry Years shall exist when OWRD makes a written declaration according to the following metrics:</p> <ol> <li><u>Dry Year Declaration in March</u> – Established only if the following conditions apply:</li> <ol> <li>The OWRD’s or Bureau of Reclamation’s predicted March month end contents of Prineville Reservoir are less than or equal to the 50 percent exceedance level of the contents at March 31 based on all data from the prior 30 years, and</li> <li>Either:</li> <ol> <li>The Prineville Reservoir outflow has not exceeded 75 cfs within 30 days of the actual date of OWRD’s Non Dry Year/Dry Year declaration, or</li> <li>The Prineville Reservoir outflow has exceeded 75 cfs within 30 days of the actual date of OWRD’s Non Dry Year/Dry Year declaration only to supply irrigation demands for downstream users.</li> </ol> </ol> <li><u>Non Dry Year Declaration</u> – Established if any of the following conditions apply:</li> <ol> <li>The conditions necessary for a Dry Year Declaration do not apply, or</li> <li>When OWRD fails to make any written Dry Year Declaration.</li> </ol> </ol> <p>OWRD shall maintain discretion to apply and interpret the Dry Year Declaration metric if there is an extenuating circumstance(s) with respect to predicted March month end contents of Prineville Reservoir or its outflows 30 days prior to a Dry or Non Dry Year Declaration so as to target a Dry Year recurrence interval of 3 out of 10 years over a 30 year period. Further, upon request by NUID and the DRC, OWRD may revise the metric, including revisions to the timing for finalizing a Dry Year or Non-Dry Year Declaration, if it is expected that the recurrence interval of a Dry Year Declaration over a 30 year period will change from 3 out of 10 years.<br /> <br /><strong>The Crooked River is also affected by CR-4, 5, and 7, conservation measures that are not dependent on stream gauging. Please see <a href='https://www.fws.gov/oregonfwo/Documents/DeschutesHCP/USFWS%20HCP%20Conservation%20Measures_2021.pdf' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>DESCHUTES BASIN HCP: Conservation Measures &amp; Monitoring Requirements</u></font></a> for more information.</strong> </p>

<div style='text-align:center;'><strong>CR-1措施:鲍曼大坝下游克罗克河流量管控</strong></div><p><br /><b>负责许可方: </b><a href='https://www.ochocoid.org/' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>奥乔科灌溉区(Ochoco Irrigation District, OID)</u></font><br /></a><b>受影响物种: </b><i>公牛鳟、钢头鳟、红大马哈鱼</i><br /><br />在与美国垦务局(Reclamation)协调下,奥乔科灌溉区(Ochoco Irrigation District, OID)将通过弃用自然来流和/或释放OID合同存储水量,以在非活跃灌溉季<sup>2</sup>,于鲍曼大坝下游的<a href='https://apps.wrd.state.or.us/apps/sw/hydro_near_real_time/display_hydro_graph.aspx?station_nbr=14080500' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OWRD水位站14080500</u></font></a>(对应水文监测站PRVO)维持日均流量50立方英尺每秒(cfs)<sup>1</sup>,且需满足以下全部条件:</p><ol><li>在年度分配日,普赖恩维尔水库内所有未签订合同的储水量(最高不超过13000英亩英尺)需留存至活跃灌溉季<sup>2</sup>结束,之后以在PRVO监测到的日均50<sup>1</sup>立方英尺每秒的速率释放。</li><li>在年度分配日,普赖恩维尔水库内所有普赖恩维尔市缓解储水量(最高不超过5100英亩英尺),且未被用于其他缓解用途<sup>3</sup>,需留存至12月1日,之后替代未签订合同的储水量进行释放,以维持在PRVO监测到的日均50立方英尺每秒的流量。</li><li>可用未签订合同储水量(最高13000英亩英尺)与前述普赖恩维尔市缓解储水量的总和,不足以维持至下一个灌溉季开始前在PRVO监测到的日均50立方英尺每秒的流量。</li></ol><p>可使用从OID用水户临时租赁的河道内水量来维持50立方英尺每秒(±5立方英尺每秒)的流量,但12月1日至1月31日期间除外。</p><p>在活跃灌溉季期间,德舒特盆地栖息地保护计划(DBHCP)不会强制要求OID或北单元灌溉区(NUID)允许垦务局为维持PRVO水位站或CAPO水位站的特定河道内流量,弃用自然来流或释放合同存储水量。但OID不得在克罗克河分水工程处截留储水,直至该储水从普赖恩维尔水库泄出且有充足时间流抵分水工程处。此外,作为鲍曼大坝的运营方,OID将响应其他合同持有人对普赖恩维尔水库储水的调用,并在24小时内开始释放请求的水量。</p><table style='border-collapse:collapse; border:none; font-size:8.0pt;'><tbody><tr><td style='border-top:solid 0.5pt; padding:5px;'>1 由于流量测量设备存在固有误差,克罗克河实际流量可能与CR-1措施中规定的流量相差±10%。</td></tr><tr><td style='padding:5px;'>2 就本保护措施而言,克罗克河的“活跃灌溉季”指克罗克河分水工程处为OID用水户输水而截留水量的时段,通常为4月中旬至10月中旬,实际日期每年略有差异。</td></tr><tr><td style='padding:5px;'>3 以本方式使用普赖恩维尔市缓解储水量需获得俄勒冈州水资源部的批准,并需遵守该水量的优先使用权要求。本措施中规定使用的普赖恩维尔市缓解储水量实际额度,可能低于分配日普赖恩维尔水库内的总储水量。</td></tr></tbody></table><div style='text-align:center;'><strong><br />CR-6措施:克罗克河泵站下游克罗克河流量管控</strong></div><br /><p><b>负责许可方: </b><a href='https://www.northunitid.com/' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>北单元灌溉区(North Unit Irrigation District, NUID)</u></font></a><br /><b>受影响物种: </b><i>公牛鳟、钢头鳟、红大马哈鱼</i> <br /><br />在DBHCP有效期内,除从普赖恩维尔水库获取的、通过与垦务局签订临时供水合同或从其他合同持有人处收购的水量外,北单元灌溉区(North Unit Irrigation District, NUID)仅当可维持表CR-6规定的最小日均流量时,方可在克罗克河泵站(里程桩27.6)处分水。该流量需通过<a href='https://apps.wrd.state.or.us/apps/sw/hydro_near_real_time/display_hydro_graph.aspx?station_nbr=14087300' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OWRD水位站14087300</u></font></a>(里程桩27.0)的实时监测数据确定,或由俄勒冈州水资源部(Oregon Water Resources Department, OWRD)设立的、可准确反映克罗克河泵站下游河段流量的替代水位站数据确定。</p><p style='font-size:9pt;'><b>表CR-6 当NUID在泵站分水时,克罗克河泵站下游需维持的最小流量<sup>1</sup>.</b></p><table style='border-collapse:collapse; border:none; font-size:8.0pt;'><tbody><tr><th style='border-top:solid 0.5pt; text-align:center;'></th><th colspan='2' style='border-top:solid 0.5pt; border-bottom:solid 1.0pt; padding:7px; text-align:center;'>最小日均流量(立方英尺每秒)</th></tr><tr style='border-bottom:solid 1.5pt;'><th>月份</th><th style='padding:5px; text-align:center;'>枯水年</th><th style='padding:5px; text-align:center;'>非枯水年</th></tr><tr><td style='padding:5px;'>4月</td><td style='text-align:center; padding:5px;'>120</td><td style='text-align:center;'>181</td></tr><tr style='background:#F2F2F2;'><td style='padding:5px;'>5月</td><td style='text-align:center; padding:5px;'>50</td><td style='text-align:center;'>95</td></tr><tr><td style='padding:5px;'>6月</td><td style='text-align:center; padding:5px;'>54</td><td style='text-align:center;'>86</td></tr><tr style='background:#F2F2F2;'><td style='padding:5px;'>7月</td><td style='text-align:center; padding:5px;'>51</td><td style='text-align:center;'>61</td></tr><tr><td style='padding:5px;'>8月</td><td style='text-align:center; padding:5px;'>56</td><td style='text-align:center;'>68</td></tr><tr style='background:#F2F2F2;'><td style='padding:5px;'>9月</td><td style='text-align:center; padding:5px;'>57</td><td style='text-align:center;'>114</td></tr><tr style='border-bottom:solid 0.5pt;'><td style='padding:5px;'>10月</td><td style='text-align:center; padding:5px;'>121</td><td style='text-align:center;'>151</td></tr><tr><td colspan='3' style='padding:5px;'><sup>1</sup> <a href='https://apps.wrd.state.or.us/apps/sw/hydro_near_real_time/display_hydro_graph.aspx?station_nbr=14087300' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>OWRD水位站14087300</u></font></a> 处的日均流量不得低于规定的最小阈值。NUID还将通过根据泵站上游流量变化手动调整分水速率,尽力使小时均流量维持在规定最小阈值以上,但考虑到全天候手动调整存在固有难度,2024年12月31日前小时均流量可低于规定最小阈值最高达20%。NUID将在泵站安装设备以实现分水速率自动调整,且不晚于2025年1月1日起,日均流量和小时均流量均不得低于规定最小阈值。</td></tr></tbody></table><p>就本措施而言,枯水年与非枯水年的判定需由OWRD根据以下标准书面宣布:</p><ol><li><u>3月枯水年判定</u>——仅当满足以下全部条件时方可判定:</li><ol><li>OWRD或垦务局预测的普赖恩维尔水库3月末蓄水量,低于或等于过去30年所有数据中3月31日蓄水量的50%超越水准,且</li><li>满足以下任一条件:</li><ol><li>在OWRD发布非枯水年/枯水年判定之日起30天内,普赖恩维尔水库泄流量未超过75立方英尺每秒,或</li><li>在OWRD发布非枯水年/枯水年判定之日起30天内,普赖恩维尔水库泄流量超过75立方英尺每秒,但仅用于满足下游用户的灌溉需求。</li></ol></li></ol><li><u>非枯水年判定</u>——满足以下任一条件时即可判定:</li><ol><li>不满足枯水年判定的全部条件,或</li><li>OWRD未作出任何书面枯水年判定。</li></ol></ol><p>若在枯水年/非枯水年判定前30天,普赖恩维尔水库预测月末蓄水量或泄流量存在特殊情况,以确保30年周期内枯水年判定的重现间隔为10年3遇,OWRD可自行决定应用和解释枯水年判定标准。此外,若预计30年周期内枯水年判定的重现间隔将偏离10年3遇,经NUID与德舒特资源委员会(DRC)请求,OWRD可修订该标准,包括修订枯水年/非枯水年判定的最终确定时间。</p><p><strong>克罗克河同时受到CR-4、5、7号非依赖河道流量监测的保护措施管控。更多信息请参阅<a href='https://www.fws.gov/oregonfwo/Documents/DeschutesHCP/USFWS%20HCP%20Conservation%20Measures_2021.pdf' target='_blank' rel='nofollow ugc noopener noreferrer'><font color='#0000ff'><u>《德舒特盆地HCP:保护措施与监测要求》</u></font></a>。</strong> </p>
提供机构:
U.S. Fish & Wildlife Service
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作