five

Energy planning and management during battery manufacturing

收藏
Figshare2019-10-01 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/Energy_planning_and_management_during_battery_manufacturing/9986048
下载链接
链接失效反馈
官方服务:
资源简介:
Abstract The aim of this study is to improve energy performance at a battery factory in Colombia by introducing the energy management approach defined in ISO 50001. In the study, the main energy consumptions were identified in the battery formation, the compressed air system and the large electric motors. An energy review was performed in the factory using measurement equipment and statistical techniques. Different actions were proposed to improve energy performance. As a result, a 3.48% reduction in electricity consumption was achieved during the implementation of the proposed measures.
创建时间:
2019-10-01
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作