Energy planning and management during battery manufacturing
收藏资源简介:
Abstract The aim of this study is to improve energy performance at a battery factory in Colombia by introducing the energy management approach defined in ISO 50001. In the study, the main energy consumptions were identified in the battery formation, the compressed air system and the large electric motors. An energy review was performed in the factory using measurement equipment and statistical techniques. Different actions were proposed to improve energy performance. As a result, a 3.48% reduction in electricity consumption was achieved during the implementation of the proposed measures.
摘要 本研究旨在通过引入ISO 50001标准规定的能源管理方法,提升哥伦比亚某电池工厂的能源绩效(energy performance)。本研究识别出该工厂的三大主要能耗环节:电池化成(battery formation)工序、压缩空气系统与大型电动机。研究团队借助测量设备与统计技术,对该工厂实施了能源评审,并提出多项旨在优化能源绩效的改进措施。最终,在实施上述改进措施期间,该工厂实现了3.48%的电力消耗降幅。




