BCMS Commencement Notices 2015
收藏资源简介:
A Commencement Notice (CN) is a notification to a Building Control Authority (BCA) that a person intends to carry out either works or a Material Change of Use to which the Building Regulations apply. The notice must be given to the authority not more than 28 days and not less than 14 days before the commencement of works or the change of use. Once validated by the building control authority, works must commence on site within the 28 day period. In the case of large developments, it is practical to submit a CN for each phase. The number of units scheduled to commence under a specific phase should be recorded in the CN. The Local Government Management Agency (LGMA) operates the Building Control Management System (BCMS). It facilitates CNS to be submitted online. The Department cleans and collates the data before publishing it on a monthly basis. This data series on commencement notices is available from March 2014. It is broken down by local authority, number of notices for residential development, number of residential units and the number of one-off residential units. More granular data on commencement notices can be found at https://www.localgov.ie/ Data from March to May 2019 has been revised. The figures for those months were Originally under-stated due to a data processing error.
开工通知书(Commencement Notice,简称CN)是指向建筑监管当局(Building Control Authority,简称BCA)提交的官方告知文书,用于告知提交方拟开展符合《建筑条例》(Building Regulations)管辖范畴的工程或实质性用途变更。该通知书需在工程开工或用途变更生效前14至28日期间提交至监管当局。经建筑监管当局审核通过后,施工方需在28日内启动现场作业。 针对大型开发项目,按各施工阶段分别提交开工通知书为务实可行的做法,且需在通知书中明确标注对应阶段拟开工的住宅单元数量。 地方政府管理署(Local Government Management Agency,简称LGMA)负责运营建筑监管管理系统(Building Control Management System,简称BCMS),该系统支持开工通知书的线上提交。相关部门会对采集到的数据进行清洗与整合后,按月对外发布。 本开工通知书数据集的时间跨度始于2014年3月,数据按地方主管部门、住宅开发类开工通知书数量、住宅单元总数及一次性住宅单元数量进行分类统计。更细分的开工通知书数据可通过https://www.localgov.ie/ 获取。 2019年3月至5月的数据集已完成修订,因当时的数据处理失误,该时段的统计数值曾被低估。



