Table- 4.12. Noise level within the power plant complex in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
收藏资源简介:
Table-4.12. Noise level within the power plant complex SL No.DateLocationsCategory of areaSite conditionConcentration Night Day time time0114-9-2010 to 15- 9-2010Project west side (inside boundary)IndustrialRunning condition67.4465.330214-9-2010 to 15- 9-2010Project east side (inside boundary)IndustrialRunning condition70.3966.170314-9-2010 to 15- 9-2010Project south side (inside boundary)IndustrialRunning condition68.1866.310414-9-2010 to 15- 9-2010Project north side (inside boundary)IndustrialRunning condition69.1167.390526-11-2010 to 27-11-2010Project west side (inside boundary)IndustrialRunning condition66.0064.270626-11-2010 to 27-11-2010Project east side (inside boundary)IndustrialRunning condition69.5065.290726-11-2010 to 27-11-2010Project south side (inside boundary)IndustrialRunning condition69.2467.380826-11-2010 to 27-11-2010Project north side (inside boundary)IndustrialRunning condition70.1566.45 Source: 450 MW CCPP environmental team measurements (2010).
表4.12 电厂厂区内噪声水平 | 序号 | 监测日期 | 监测点位 | 区域类别 | 现场工况 | 夜间等效声级 | 昼间等效声级 | | ---- | ---- | ---- | ---- | ---- | ---- | ---- | | 01 | 2010年9月14日至2010年9月15日 | 项目西侧(厂界内) | 工业区域 | 运行工况 | 67.44 | 65.33 | | 02 | 2010年9月14日至2010年9月15日 | 项目东侧(厂界内) | 工业区域 | 运行工况 | 70.39 | 66.17 | | 03 | 2010年9月14日至2010年9月15日 | 项目南侧(厂界内) | 工业区域 | 运行工况 | 68.18 | 66.31 | | 04 | 2010年9月14日至2010年9月15日 | 项目北侧(厂界内) | 工业区域 | 运行工况 | 69.11 | 67.39 | | 05 | 2010年11月26日至2010年11月27日 | 项目西侧(厂界内) | 工业区域 | 运行工况 | 66.00 | 64.27 | | 06 | 2010年11月26日至2010年11月27日 | 项目东侧(厂界内) | 工业区域 | 运行工况 | 69.50 | 65.29 | | 07 | 2010年11月26日至2010年11月27日 | 项目南侧(厂界内) | 工业区域 | 运行工况 | 69.24 | 67.38 | | 08 | 2010年11月26日至2010年11月27日 | 项目北侧(厂界内) | 工业区域 | 运行工况 | 70.15 | 66.45 | 数据来源:450兆瓦联合循环热电厂(Combined Cycle Power Plant, CCPP)环境团队2010年实测数据。



