ASTER Expedited L1B Registered Radiance at the Sensor V003
收藏Global Change Master Directory (GCMD)2025-04-15 更新2026-04-25 收录
下载链接:
https://cmr.earthdata.nasa.gov/search/concepts/C179460406-LPDAAC_ECS.html
下载链接
链接失效反馈官方服务:
资源简介:
The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Expedited Level 1B Registered Radiance at the Sensor global data product is radiometrically calibrated and geometrically co-registered. Application of intra-telescope and inter-telescope registration corrections for all bands are relative to the reference band for each telescope: Visible and Near Infrared (VNIR) Band 2, Shortwave Infrared (SWIR) Band 6, and Thermal Infrared (TIR) Band 11. The Expedited Level 1B data product is similar to the ([AST_L1B](https://doi.org/10.5067/ASTER/AST_L1B.003)) with a few notable exceptions. These include:
* The AST_L1BE is available for download within 48 hours of acquisition in support of field calibration and validation efforts, in addition to emergency response for natural disasters where the quick turn-around time from acquisition to availability would prove beneficial in initial damage or impact assessments.
* The registration quality of the AST_L1BE is likely to be lower than the AST_L1B, and may vary from scene to scene.
* The AST_L1BE dataset does not contain the VNIR 3B (aft-viewing) Band.
* This dataset does not have short-term calibration for the Thermal Infrared (TIR) sensor.
Known Issues
* TIR bands: Acquisitions for TIR bands ended on January 16, 2026, at 05:10:45 UTC, when the ASTER TIR instrument was permanently turned off due to power limitations on the Terra spacecraft. More information is available in this [NASA Science News Brief](https://science.nasa.gov/blogs/science-news/2026/02/12/terra-adjusts-instrument-operations-to-extend-mission-life/).
* Data acquisition gaps: On November 28, 2024, one of Terra's power-transmitting shunt units failed. As a result, there was insufficient power to maintain functionality of the ASTER instrument. ASTER resumed acquisitions for the VNIR bands on January 18, 2025, and for the TIR bands on April 15, 2025. Users should note the data gap in ASTER acquisitions from November 28, 2024, through January 16, 2025, for VNIR observations, and a gap from November 28, 2024, through April 15, 2025, for TIR acquisitions.
* SWIR bands: ASTER SWIR detectors are no longer functioning as of January 12, 2009, due to anomalously high SWIR detector temperatures.
* SWIR anomaly: Users are advised that ASTER SWIR data acquired from April 2008 to January 11, 2009, exhibit anomalous saturation of values and anomalous striping. This effect is also present for some prior acquisition periods. Please refer to the [ASTER SWIR User Advisory](https://lpdaac.usgs.gov/documents/1661/ASTER_SWIR_User_Advisory_Jan_12_2009.pdf) for more details.
提供机构:
LPDAAC_ECS
创建时间:
2025-04-15



