Additional file 6 Video synchronization, trajectory assignment and pose estimation. Additional scripts for video synchronization, frame extraction, trajectory assignment and pose estimation.
A two-week field operation was conducted in the John Day Reservoir on the Columbia River to image the floor of the pool, to measure the distribution and thickness of post-impoundment sediment, and to