Integrated Mobility Plan 2022 Regional Centre Bikeway Network Map
收藏数据链接:
官方服务:
资源简介:
Identifies the Integrated Mobility Plan proposed cycling infrastructure, including location, proposed type, and status. This data was created for the purpose of communicating the progress of the implementation of the Integrated Mobility Plan. Only contains cycling-specific routes from Figure 17 of the Integrated Mobility Plan to be completed by 2022. Does not include longer term vision for multi-use pathway connections (IMP Figure 18). Metadata
创建时间:
2019-05-29



