遇见数据集

2018 Sidewalk Repair and Reconstruction Projects

收藏
City of Bloomington Open Data Portal2023-05-16 更新2026-05-26 收录
官方服务:

资源简介:

A summary of all the concrete sidewalk repair and reconstruction projects that occurred during 2018. This includes work done in association with the City's Sidewalk Assistance Program, as well as general maintenance, repair and reconstruction to sidewalk segments, driveway entrances, curbs and ramps This summary includes all projects that were completed both by City of Bloomington Street Department crews and those that were performed by personnel from Groomer Construction, which was contracted by the City of Bloomington to assist with sidewalk and ramp repair work in 2018.

创建时间:
2023-05-16
二维码
社区交流群
二维码
科研交流群
商业服务