Data for: An approach based on Bayesian network models for predicting cost overrun risks in engineering projects
收藏官方服务:
资源简介:
Data needed to create the CPT of the target node in the Bayesian Network of the case study
创建时间:
2020-04-12

Data needed to create the CPT of the target node in the Bayesian Network of the case study