As a condition of the construction permit, environmental monitoring during the Site 1 Impoundment Project phase 1 construction is required. It is required that contractors conduct operations in a mann
The WET Labs ECO-NTUSB 651 was deployed on 2015-09-14 at Fraser River Delta Upper Slope. This site is located on the upper slope of the Fraser River delta, where depth is approximately 100 metres. Thi