前滩21-03项目监测数据表(地铁变形数据)

收藏
国家基础学科公共科学数据中心2024-03-05 收录
下载链接:
https://www.nbsdc.cn/general/dataDetail?id=64ef8467bb16e0591d025120&type=1
下载链接
链接失效反馈
官方服务:
资源简介:
面向前滩21-03项目施工,对邻近的上海轨道交通6号线、8号线、11号线的沉降、收敛等变形情况开展监测,通过人工全站仪测量、静力水准自动化测量、激光测距仪自动化测量等,及时掌握地铁变形情况,并将数据传输至课题的地下基础设施智慧集成平台,为平台提供基础数据支撑,通过平台集成的相关智能诊断模块,融合平台打通壁垒接入的基坑自身变形数据,对隧道的结构安全做出判断,从而保障地铁运营和市民乘客安全。

Aimed at the construction of the Qiantan 21-03 Project, this dataset monitors deformation indicators including settlement and convergence of the adjacent Shanghai Rail Transit Lines 6, 8 and 11. Multiple measurement methods are applied, such as manual total station survey, automated hydrostatic leveling monitoring, and automated laser rangefinder measurement, to timely acquire the deformation status of the subway. The collected data is transmitted to the intelligent integration platform for underground infrastructure of the corresponding research project, providing fundamental data support for the platform. Through the relevant intelligent diagnosis modules integrated on the platform, by fusing the foundation pit deformation data accessed after breaking through data silos across the platform, judgments on the structural safety of the tunnels can be made, thereby ensuring the safe operation of the subway and the personal safety of passengers.
提供机构:
上海申通地铁集团有限公司
搜集汇总
数据集介绍
main_image_url
背景与挑战
背景概述
该数据集是前滩21-03项目施工期间对上海轨道交通6号线、8号线、11号线进行的隧道变形监测数据,包括沉降、收敛等指标,通过人工全站仪、静力水准自动化等多种测量方法采集,数据量为9.85MB,包含5个文件。数据用于支撑地下基础设施智慧集成平台,以评估隧道结构安全,保障地铁运营安全,属于国家重点研发计划项目的一部分。