遇见数据集

Optimal operation conditions of pilot plant-scale SBR biological treatment for marine wastewater with eco-HEMS during operation period (2 months, n = 360 cycles).

收藏
Figshare2020-05-19 更新2026-04-28 收录
官方服务:

资源简介:

Optimal operation conditions of pilot plant-scale SBR biological treatment for marine wastewater with eco-HEMS during operation period (2 months, n = 360 cycles).

创建时间:
2020-05-19
二维码
社区交流群
二维码
科研交流群
商业服务