Data-Gouv-FR/registre-national-des-installations-de-production-et-de-stockage-delectricite-au-31-03-2026
收藏资源简介:
该注册表记录了截至2026年3月31日法国本土和非互联区域(ZNI)直接或间接连接到公共电网的电力生产和储存设施。根据法国能源法典第L142-9-1条,RTE作为公共输电网络运营商负责编制和维护此国家注册表。公共配电网络运营商需向RTE提供其连接设施的相关信息。数据提供方包括RTE、Enedis、EDF SEI以及多家地方电力分销商(ELD)。小于36kW的设施数据按照2016年7月7日法令要求进行聚合后公开。根据LTECV第179条的法规义务,最细地理粒度为IRIS网格,时间粒度为年度。本数据集还补充了按IRIS网格划分的小于36kW设施数量的数据集。
This register presents electricity production and storage installations directly or indirectly connected to the public electricity grids in mainland France and non-interconnected zones (ZNI) as of March 31, 2026. According to Article L142-9-1 of the French Energy Code, RTE, as the manager of the public electricity transmission network, is responsible for producing the national register of electricity production and storage installations. The managers of public electricity distribution networks transmit the necessary information concerning installations connected to their networks to the public electricity transmission network manager. Data providers include RTE, Enedis, EDF SEI, and various local electricity distributors (ELD). Information on installations of less than 36 kW is made public after aggregation, as defined in the decree of July 7, 2016. In compliance with the regulatory obligations of Article 179 of the LTECV, the finest territorial granularity allowed is the IRIS grid, and the temporal granularity is annual. This dataset is complemented by a dataset on the number of installations of less than 36 kW per IRIS geographical grid.




