This dataset details the production offer in France (production facilities and erasure capacities) based on a common scenario for 2021-2025 and then two scenarios for the 2030 cut. The means of produ
Final annual departmental history at 31 December of the lengths (km) of circuits and lines of aerial and underground towers in operation of the electricity transmission network, by voltage level (63 k
This dataset presents the following monthly values: \- Net injections into the TEN network by sector \- Net removals from distribution networks \- Gross removals from direct customers \- Energy
This dataset shows the number of installations less than 36 KW per IRIS geographic mesh. This is the aggregation of installations with an installed or connected capacity of less than 36 KW and having
Ce registre présente une vision prospective de 3 à 5 ans des contraintes résiduelles prospectives sur le Réseau de Transport d’Électricité des différentes régions de France métropolitaine, hors Corse.