Monitoring of the exchange capacities at the French borders of the South-West Europe region
收藏资源简介:
**“Monitoring Clean Energy Package 70 %”** **** The European Electricity Regulation, as part of the Clean Energy Package adopted in 2019, requires TSOs to be able to monitor the network capacity to be made available for cross-border trade by introducing an ambitious 70 % target. According to the recommendation of ACER (Agency for the Cooperation of Energy Regulators), this monitoring is carried out, on each step of time, at the mesh of critical network elements that are provided to the various capacity calculations for border trade within the European Union. In this context, RTE and CRE wish to make available to all, the monitoring data that is produced on the subject at the French level. SWE, Western Central Europe (CORE/CWE) and NIB are the 3 capacity calculation regions within the European Union, in which RTE participates (SWE for the border with Spain; NIB for Border with Italy; CWE for borders with Germany and Belgium). Since 9 June 2022 CORE has replaced the CWE region. The term CWE will therefore be retained for data from 1 January 2022 to 8 June 2022. For CWE/CORE (borders with Germany and Belgium) and NIB (border with Italy), find the following datasets: [Monitoring of exchange capacities at the French borders of the CORE/Central Western Europe region – Open Data Networks Énergies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-core-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) [Monitoring the exchange capacities at the French borders of the CWE/Central Western Europe region – Open Data Networks Énergies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-cwe-2021-2022/information/?disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&disjunctive.maczt_superieure_a_70) [Monitoring the exchange capacities at the French borders of the Italy North region – Open Data Networks Energies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-nib-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&dataChart=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%3D%3D) The description of the borders is attached. **“Monitoring Clean Energy Package 70 %”** **** The european electricity regulation introduces in 2019, a minimum threshold of 70 % of the capacity to be made available for cross-border trade. In the frame of this regulation, TSOs have to be able to monitor this network capacity. According to ACER (Agency for the Cooperation of Energy Regulators) recommendation, this monitoring takes place, on each Timestamp, on the critical network element provided by TSOs to the capacity calculation project at European Union level. Within this framework, RTE and CRE would like to share, in Opendata, the dataset produced on the subject on French level.
**“清洁能源一揽子计划70%监测”** 作为2019年正式通过的《清洁能源一揽子计划》配套监管文件,《欧盟电力监管条例》设定了70%的前瞻性目标,要求输电系统运营商(Transmission System Operator, TSO)对用于跨境电力交易的可用电网容量实施监测。根据欧洲能源监管合作署(Agency for the Cooperation of Energy Regulators, ACER)的建议,该监测需在每个时间步长下,针对欧盟境内用于跨境交易容量计算的关键网络元件组成的电网网架节点开展。 在此背景下,法国输电系统运营商RTE与法国能源监管委员会CRE愿将法国境内该监测主题下生成的全部监测数据面向全社会公开。 瑞典(SWE)、中西欧(CORE/CWE)以及北欧互联电网(Nordic Border Grid, NIB)是欧盟境内三大容量计算区域,RTE均参与相关工作:其中SWE对应与西班牙的跨境边界,NIB对应与意大利的跨境边界,CWE对应与德国、比利时的跨境边界。自2022年6月9日起,CORE区域正式取代CWE区域,因此2022年1月1日至6月8日的数据集仍将沿用CWE区域的称谓。 针对CWE/CORE(与德国、比利时的跨境边界)以及NIB(与意大利的跨境边界)两类区域,可获取如下数据集: 【CORE/中西欧区域法国边境交换容量监测】——法国能源开放数据平台(ODRÉ,opendatasoft.com),链接:https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-core-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70 【CWE/中西欧区域法国边境交换容量监测】——法国能源开放数据平台(ODRÉ,opendatasoft.com),链接:https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-cwe-2021-2022/information/?disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&disjunctive.maczt_superieure_a_70 【意大利北部区域法国边境交换容量监测】——法国能源开放数据平台(ODRÉ,opendatasoft.com),链接:https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-nib-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&dataChart=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%3D%3D 边界说明详见附件。 **“清洁能源一揽子计划70%监测”** 2019年出台的《欧盟电力监管条例》设定了跨境电力交易可用容量不得低于70%的最低阈值。依据该条例要求,输电系统运营商需具备监测该类电网容量的能力。根据欧洲能源监管合作署(Agency for the Cooperation of Energy Regulators, ACER)的建议,该监测需在每个时间戳下,针对输电系统运营商提交至欧盟层面容量计算项目的关键网络元件开展。在此框架下,RTE与CRE愿通过开放数据平台共享法国境内该主题下生成的数据集。