In the Espoo procedure ‘Decommissioning of the Isar 1 NPP’, a consultation meeting between the authorities of Germany and Austria took place on 4 November 2014 at the Bavarian State Ministry for the Environment and Consumer Protection (StMUV). On the Austrian side, the Federal Ministry of Agriculture, Forestry, Environment and Water Management (BMLFUW) participated with an expert from the Oeko-Institut e.V., on the German side the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) and StMUV with TÜV SÜD as its expert.

在埃斯波程序(Espoo Procedure)“伊萨尔1号核电站(Isar 1 NPP)退役”项下,德国与奥地利两国主管部门于2014年11月4日在巴伐利亚州环境与消费者保护部(StMUV)召开磋商会议。奥方由奥地利联邦农业、林业、环境与水利部(BMLFUW)牵头,携奥科研究所(Oeko-Institut e.V.)的一名专家参与本次会议;德方则由德国联邦环境、自然保护、建筑与核安全部(BMUB)与巴伐利亚州环境与消费者保护部(StMUV)共同参与,其专家由南德意志集团(TÜV SÜD)派出。