遇见数据集

Monitoring of the exchange capacities at the French borders of the CWE/Central-West Europe region

收藏
data.europa2023-07-17 更新2025-05-31 收录
官方服务:

资源简介:

**“Monitoring Clean Energy Package 70 %”** **** The European Electricity Regulation, as part of the Clean Energy Package adopted in 2019, requires TSOs to be able to monitor the network capacity to be made available for cross-border trade by introducing an ambitious 70 % target. According to the recommendation of ACER (Agency for the Cooperation of Energy Regulators), this monitoring is carried out, on each step of time, at the mesh of critical network elements that are provided to the various capacity calculations for border trade within the European Union. In this context, RTE and CRE wish to make available to all, the monitoring data that is produced on the subject at the French level. SWE, Western Central Europe (CORE/CWE) and NIB are the 3 capacity calculation regions within the European Union, in which RTE participates (SWE for the border with Spain; NIB for Border with Italy;CWE for borders with Germany and Belgium). Since 9 June 2022 CORE has replaced the CWE region. The term CWE will therefore be retained for data from 1 January 2022 to 8 June 2022. For SWE (border with Spain) and NIB (border with Italy), find the following datasets: [Monitoring of exchange capacities at the French borders of the CORE/Central Western Europe region – Open Data Networks Énergies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-core-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) [Monitoring of exchange capacities at the French borders of the South-West Europe region – Open Data Networks Energies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-swe-2021-2022/information/?disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&disjunctive.maczt_superieure_a_70) [Monitoring the exchange capacities at the French borders of the Italy North region – Open Data Networks Energies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-nib-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) _[[ ](https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-swe/information/)_ The description of the borders is attached. The time steps corresponding to capacity calculation errors that do not allow the assessment of the CEP 70 % or errors in the monitoring tool used by RTE have been added to the 2022 datasets. They are represented by the term “Not provided” in the column “Name of the CNEC”. **“Monitoring Clean Energy Package 70 %”** **** The european electricity regulation introduces in 2019, a minimum threshold of 70 % of the capacity to be made available for cross-border trade.In the frame of this regulation, TSOs have to be able to monitor this network capacity. According to ACER (Agency for the Cooperation of Energy Regulators) recommendation, this monitoring takes place, on each Timestamp, on the critical network element provided by TSOs to the capacity calculation project at European Union level. Within this framework, RTE and CRE would like to share, in Opendata, the dataset produced on the subject on French level. The time steps corresponding to errors in the capacity calculation that do not allow the evaluation of the 70 % CEP to be carried out correctly, or to errors in the monitoring tool used by RTE, have been added to the 2022 data sets. They are represented by the term “Not Provided” in the column “Name of the CNEC”.**“Monitoring Clean Energy Package 70 %”** **** The European Electricity Regulation, as part of the Clean Energy Package adopted in 2019, requires TSOs to be able to monitor the network capacity to be made available for cross-border trade by introducing an ambitious 70 % target.According to the recommendation of ACER (Agency for the Cooperation of Energy Regulators), this monitoring is carried out, on each step of time, at the mesh of critical network elements that are provided to the various capacity calculations for border trade within the European Union. In this context, RTE and CRE wish to make available to all, the monitoring data that is produced on the subject at the French level. SWE, Western Central Europe (CORE/CWE) and NIB are the 3 capacity calculation regions within the European Union, in which RTE participates (SWE for the border with Spain; NIB for Border with Italy; CWE for borders with Germany and Belgium). Since 9 June 2022 CORE has replaced the CWE region. The term CWE will therefore be retained for data from 1 January 2022 to 8 June 2022. For SWE (border with Spain) and NIB (border with Italy), find the following datasets: [Monitoring of exchange capacities at the French borders of the CORE/Central Western Europe region – Open Data Networks Énergies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-core-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) [Monitoring of exchange capacities at the French borders of the South-West Europe region – Open Data Networks Energies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-swe-2021-2022/information/?disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&disjunctive.maczt_superieure_a_70) [Monitoring the exchange capacities at the French borders of the Italy North region – Open Data Networks Energies (ODRÉ) (opendatasoft.com)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-nib-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) _[[ ](https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-swe/information/)_ The description of the borders is attached. The time steps corresponding to capacity calculation errors that do not allow the assessment of the CEP 70 % or errors in the monitoring tool used by RTE have been added to the 2022 datasets. They are represented by the term “Not provided” in the column “Name of the CNEC”. **“Monitoring Clean Energy Package 70 %”** **** The european electricity regulation introduces in 2019, a minimum threshold of 70 % of the capacity to be made available for cross-border trade. In the frame of this regulation, TSOs have to be able to monitor this network capacity. According to ACER (Agency for the Cooperation of Energy Regulators) recommendation, this monitoring takes place, on each Timestamp, on the critical network element provided by TSOs to the capacity calculation project at European Union level. Within this framework, RTE and CRE would like to share, in Opendata, the dataset produced on the subject on French level. The time steps corresponding to errors in the capacity calculation that do not allow the evaluation of the 70 % CEP to be carried out correctly, or to errors in the monitoring tool used by RTE, have been added to the 2022 data sets. They are represented by the term “Not Provided” in the column “Name of the CNEC”.

**"清洁能源一揽子计划70%目标监测**" 2019年通过的《欧盟电力法规》作为《清洁能源一揽子计划》的组成部分,要求输电系统运营商(Transmission System Operator, TSO)设定70%的雄心勃勃目标,对跨境贸易可用电网容量开展监测工作。根据欧洲能源监管合作署(Agency for the Cooperation of Energy Regulators, ACER)的建议,该监测需在每个时间步长下,针对欧盟范围内用于跨境贸易容量计算的关键网络元件网格实施。 在此背景下,法国输电系统运营商(Réseau de Transport d'Électricité, RTE)与法国能源监管委员会(Commission de Régulation de l'Énergie, CRE)愿向公众开放法国境内相关监测数据集。 欧盟范围内共有三个容量计算区域,分别为瑞典边境区域(SWE)、中西欧区域(CORE/CWE)以及北意大利边境区域(NIB),RTE均参与其中:SWE对应法西边境,NIB对应法意边境,CWE对应法德、法比边境。2022年6月9日起,CORE区域取代了原CWE区域,因此2022年1月1日至6月8日的相关数据仍沿用CWE这一称谓。 针对瑞典边境区域(SWE,对应法西边境)与北意大利边境区域(NIB,对应法意边境),可通过以下数据集获取相关信息: 1. [CORE/中西欧区域法国边境交换容量监测——法国能源开放数据网络(Open Data Networks Énergies, ODRÉ)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-core-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) 2. [西南欧区域法国边境交换容量监测——法国能源开放数据网络(ODRÉ)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-swe-2021-2022/information/?disjunctive.valeur_ajoutee_a_appliquer_le_cep_70&disjunctive.maczt_superieure_a_70) 3. [北意大利区域法国边境交换容量监测——法国能源开放数据网络(ODRÉ)](https://odre.opendatasoft.com/explore/dataset/monitoring-capacites-echanges-nib-2022/information/?disjunctive.maczt_superieure_a_70&disjunctive.valeur_ajoutee_a_appliquer_le_cep_70) 另有补充数据集:[https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-swe/information/](https://opendata.reseaux-energies.fr/explore/dataset/monitoring-capacites-echanges-swe/information/) 边境相关说明详见附件。 2022年数据集已补充两类时间步长数据:一是无法正确评估70%清洁能源一揽子计划(Clean Energy Package, CEP)目标的容量计算错误对应时间步长,二是RTE所使用监测工具出现错误对应的时间步长。此类数据在"关键网络元件约束名称(Critical Network Element Constraint, CNEC)"列中以"未提供"标识。

创建时间:
2023-07-17
二维码
社区交流群
二维码
科研交流群
商业服务