Drobeta Turnu Severin Heavy Water Plant: Functioning and Shutting Down
收藏数据链接:
官方服务:
资源简介:
Due to the special working conditions in the heavy water plant, an extensive research and program has been developed for the operational safety of the installations, based on specific action methodologies and in situ experimental programs for the evaluation of the long-term behavior of materials and installations. After December 1989, the operation of the modules was stopped for about three years, for the modernization of the technological equipment and the surveillance and environmental protection systems. In September 2015, the production of heavy water was stopped and the plant staff was laid off.
提供机构:
Sfetcu, Nicolae创建时间:
2024-06-25



