前滩21-02项目监测月报(地铁变形、病害数据)
收藏资源简介:
面向前滩21-02项目施工,对邻近的上海轨道交通6号线、8号线、11号线的沉降、收敛等变形情况开展监测,通过人工全站仪测量、静力水准自动化测量、激光测距仪自动化测量等,及时掌握地铁变形情况,并将数据传输至课题的地下基础设施智慧集成平台,为平台提供基础数据支撑,通过平台集成的相关智能诊断模块,融合平台打通壁垒接入的基坑自身变形数据,对隧道的结构安全做出判断,从而保障地铁运营和市民乘客安全。
Targeting the construction of the Qiantan 21-02 Project, this dataset conducts monitoring on deformation conditions including settlement and convergence of the adjacent Shanghai Rail Transit Lines 6, 8 and 11. Multiple measurement technologies such as manual total station survey, automated hydrostatic leveling monitoring and automated laser rangefinder monitoring are adopted to timely grasp subway deformation status. The collected data is transmitted to the intelligent integration platform for underground infrastructure of the relevant research project, providing basic data support for the platform. By integrating the foundation pit deformation data accessed by breaking through data silos via the intelligent diagnosis modules integrated in the platform, the structural safety of the tunnels is evaluated, so as to guarantee the safe operation of the subway and the safety of citizens and passengers.